Our Projects

PROJECT IN WATER TREATMENT PLANT

Main Contractor : Precision Control (Veolia)

Location : Pioneer road

Job Done : Electrical Instrument Project

računanje postotka Biznis ideje ljubavni sat evri u dinare gledalica vrijeme sutra umrli danas Weight Loss Injections

View Project Gallery

PROJECT IN WATER TREATMENT PLANT

Main Contractor : Cyclect Electrical Engineering Pte Ltd (Veolia)

Location : IMF Woodlands

Job Done : Electrical Instrument Project

Scope of Work:

MCC & PLC panel Installation, cable tray and trunking installation and cable laying, Instrument installation, Cable Termintion, Testing and Commissioning

računanje postotka Biznis ideje ljubavni sat evri u dinare gledalica vrijeme sutra umrli danas Weight Loss Injections

View Project Gallery

PROJECT IN SEMICONDUCTOR

Main Contractor : Cyclect (Veolia)

Location : IMF Woodlands

Job Done : Electrical Instrument Project

Scope of Work:

MCC & PLC panel Installation, cable tray and trunking installation and cable laying, Instrument installation, Cable termination, Testing and Commissioning

računanje postotka Biznis ideje ljubavni sat evri u dinare gledalica vrijeme sutra umrli danas Weight Loss Injections

View Project Gallery

PROJECT IN EXXONMOBILE Jurong Island

Main Contractor : FWP (LOH & LOH)

Location : Area 18

Job Done : Temp Electrical Installation work

Under ground cable laying (upto 4c X 240sqmm), RMU & MSB glanding and termination. Office lighting and power wiring. Fire alarm system. PA system, street lighting. All the distribution Board Installation and Termination.računanje postotka Biznis ideje ljubavni sat evri u dinare gledalica vrijeme sutra umrli danas Weight Loss Injections

View Project Gallery

PROJECT IN SUT (SAKKRA) PLANT

Main Contractor : Precision

Location : Jurong Island

Job Done : Electrical Instrumentation Job on the Skit.

MCC & PLC panel Installation, cable tray and trunking installation and cable laying, Instrument installation, termination and testing

View Project Gallery

Wyeth S40 PROJECT

Main Contractor : M+W Zanter(CYCLECT)

Location : TUAS

Job Done : Electrical (installation works)

Job Duration : Dec 08 May 09

Main cable ladder install for 22KV Cable. Laying HT cable 3cx185sqmm. All the cable ladder for sub main cables. (up to 240sqmm) all the sub main cable laying and terminations. All the VFDs, ISOLATORs installed and gland and terminations.

View Project Gallery

ISK PROJECT

Main Contractor : CYCLECT

Location : TUAS

Job Done : Electrical installation works

Job Duration : Jan 09 May 09

All the earthing system for turbine.( CAD welding). All the lighting and power point install and wiring. Install truking and conduits.

View Project Gallery

PROJECT IN POWER PLANT (CCP5)

Main Contractor : CAMMON (Cyclect)

Location : TUAS

Job Done : Electrical Installation work

Job Duration : April 2012 February 2013

HT Cable laying, LV Cable laying and Termination includes all the supports system

View Project Gallery
Showing 1 to 8 of 13 entries