Our Projects

PROJECT IN CHEMICAL PLANT

Main Contractor : FLC

Location : Hitachi.(Loyang & Bedok)

Job Done : Control Panel Wiring & Modification.

Control panel Installation, cable tray and trunking installation and cable laying Instrument installation, termination and testing, loop checking. Level sensor install on the tank

View Project Gallery

PROJECT IN MACHINE HOOK UP

Main Contractor : 3M SG515T Black Coperial / UMCI UB2F/ ST AMK (Cyclect)

Location : Tuas / UMCI / Ang Mo Kio

Job Done : Machine Hook-Up

Job Duration : Dec 2011 – Jun 2012 / Aug 2014 – Dec 2014 & Jan 2014 – Aug 2014.

Support system, cable laying, Cable Ladder / Tray , Power / Control cable and termination

View Project Gallery
Showing 1 to 2 of 2 entries